Precautions before using tower crane equipment
Precautions before using tower crane equipment
News Source:   2016-10-21 14:57:06

 

Before starting construction, transportation, and other work on tower cranes, Wuxi Jushen Tower Crane suggests that inspections should be carried out before operation to ensure safe production and smooth operation.
    1. Wuxi Jushen Tower Crane suggests that the handover procedures must be carried out before the crane driver changes shifts, and the mechanical resume and handover records should be checked for filling out and recording items.

    2. Before starting tower crane work, it is necessary to pay attention to conducting static inspections in order to detect potential hazards as soon as possible. The static inspection content includes: checking the fastening condition of each main bolt, and ensuring that there are no cracks or open welds in the weld seam and main steel; Check that the oil level of the mechanical transmission gearbox, hydraulic oil tank, etc. meets the standards; Check that all brake wheels and brake bands (shoes) are undamaged and brake sensitively; The hook, snap ring, and steel wire rope should meet the standards; The safety devices (torque limiter, weight limiter, walking, height variation limit, and hook safety, etc.) are sensitive and reliable; Check that the operating system and electrical system are in good contact, without looseness or exposed wires. In addition, for tower cranes with elevators, it is necessary to verify the safety and reliability of each safety device.

    3. Wuxi Jushen Tower Crane suggests that before starting the tower crane operation, it is also important to note that the power distribution box should have the linkage controller in the zero position before power transmission. After closing, check that there is no leakage in the metal structure before starting the machine. All electrical systems must have good grounding or neutral protection. Make a set of grounding every 20m, which should not be connected to the building, and the grounding resistance should not exceed 4 ohms; All parts of the crane must not have obstacles within 1 meter of operation; Before operating the tower crane, it should be operated with no load or tested, and confirmed to be correct before it can be put into production.

Wuxi Jushen Crane Co., Ltd. has been dedicated for 40 years and only produces cranes that provide customers with peace of mind. If you want to customize a tower crane, we recommend that you directly call our hotline  and we will design the corresponding plan according to your requirements.

    

               

 